Above is a screenshot of a working-session with us and Mr. Baraty discussing the drawer layout of the TechnoCart. Putting a close to winter break progress and transitioning into second-semester Fellows, we feel pretty good about where we currently are. We have a physical, industrial, and quite hefty structure to work with now, we have a final design plan, and we are aware and feel good for what's to come. Now, that's not to say this second semester of progress is anywhere short of daunting. We have loads of research, consulting, and careful assembly to accomplish to engineer parts like the pneumatic hinge, drawer complex, monitor mounts, electricity cabling, laser-cut storage, and more. Winter break was a success -- we are proud of where we currently are, and we are truly excited to keep moving forward in the months to come (and to present our progress!).
1 Comment
Even through the challenge of the super-spreader Omicron variant, Team Techno was definitely productive over winter break. The TechnoCart frame has been fully assembled! This is where we wanted to be at this point when we were first scheduling our goals, so its a pretty satisfying milestone to reach. In addition to assembling the frame, after hours of research + back and forth, we also ordered base plates, wheels, and bolts to mobilize the frame (once those parts arrive). To finish off our holiday-break-Fellows-project-work, we met with Mr. Baraty to discuss future design plans, catch up on our current project state, and analyze future material needs.
|